Located above Bond Street station in London’s West End, 65 Davies Street is a prestigious 6,000m² commercial development delivered by Multiplex for Grosvenor, incorporating shell and core construction and a Category A fit-out.

Completed in November 2023, the development marked a significant milestone for eleXion as its first full chemical-free water treatment project for Multiplex.

Working alongside Reigate Environmental Services and the wider project team, eleXion helped deliver an approach that reduced water consumption, lowered capital and commissioning costs and simplified ongoing water treatment.

The Challenge

The development incorporates two roof-mounted air source heat pumps, with low-temperature hot water (LTHW) and chilled water systems serving primary ventilation equipment and 288 fan coil units across six floors.

With a combined system volume of 28,000 litres, traditional chemical cleaning and flushing would have required significant volumes of water and chemical additives.

Both Multiplex and Grosvenor recognised the environmental and commercial benefits of adopting a chemical-free approach. A change to the original water treatment specification was agreed, with the aim of reducing water waste, lowering costs and supporting the long-term protection of the heating and cooling systems.

The Solution

eleXion provided technical consultancy and water treatment equipment, working alongside Reigate Environmental Services to implement a chemical-free cleaning and commissioning process agreed with Arup and Grosvenor.

The methodology followed BSRIA BG29/2021, incorporating VDI 2035 water quality parameters into the agreed method statement.

A purpose-built filling rig incorporating demineralisation, UV filtration and a copper-silver anode was used to condition the water from the initial fill. Closed-loop cleaning, combined with traditional backflushing of terminal units, significantly reduced the volume of water discharged to drain.

Davies Street Mayfair eleXion rig

The completed systems included:

  • Elector L60 and REFILL VA 26 units serving the 10,000-litre LTHW system.
  • Elector XL130 and REFILL VA 40 units serving the 18,000-litre chilled water system.

Adopting a chemical-free approach also enabled the removal of the vacuum degasser, dosing pot and side-stream filter from the original system design, reducing capital expenditure and simplifying ongoing water treatment requirements.

Regular on-site measurements and laboratory analysis enabled the project team to monitor water quality throughout commissioning and refine the treatment process where required. This included the introduction of additional UV filtration and increased system circulation.

The Outcome

The chemical-free approach delivered significant environmental and commercial benefits, with an estimated 256,000 litres of water saved during flushing, equivalent to a 91% reduction compared with traditional flushing methods.

The project also benefited from:

  • Reduced capital expenditure through simplified system design.
  • Lower commissioning costs.
  • Elimination of chemical cleaning agents, biocides and inhibitors.
  • Reduced ongoing water treatment costs.
  • Good water quality results continuing beyond handover.

The project demonstrated the benefits of combining chemical-free water treatment with regular monitoring, technical expertise and close collaboration across the project team.

As eleXion’s first full chemical-free water treatment project for Multiplex, 65 Davies Street provided valuable practical experience to inform subsequent commercial developments.

In November 2026, David Wilson of Multiplex shared the project’s approach, experiences and lessons learned at eleXion’s redoX launch event at CIBSE headquarters.

Need support with a similar project?

Speak to our team about chemical-free water treatment for commercial heating and cooling systems.

Contact us

Other Projects

*Figures are drawn from real project data and are shown as examples. Actual savings and performance will vary by system and are not guaranteed.