Westminster council goes chemical free
Further sites joining the chemical free revolution!
Westminster Council – Parsons North
This time the switch to chemical free was as a result of failed buffer vessels.
Both vessels have been replaced as a precaution, due to severe corrosion to the base of the left handside vessel.
The total failure resulted in a loss of services for the residents, until the vessel was isolated and drained.
2 new vessels were custom made to suit existing pipework, meaning no downtime for the residents during the switch.
Supplied with our industry leading 10 year warranty, when fitted alongside our chemical free system.
Shockingly this site is only around 4 years old.
Our solution, an asset which protects your other other assets!